Last Friday saw the official opening of the new construction for Wolfert Lansing in Bergschenhoek, a school for secundary education where personal attention and guidance are of paramount importance. The new building has been realized to accommodate the growing number of students and to continue to guarantee the high level of the education provided. The design is by cepezed and cepezedinterior.
The school is over 5,500 m² in size, three storeys high and integrated into the new area De Beeldentuin, with lots of greenery, water and sturdy autonomous building volumes. By means of the CD20 concrete building system, it has been realized as a circular construction kit. It is not connected to the gas network and meets all standards for Fresh Schools Class B. In addition, it was developed very cost-effectively.