Peter van den Heuvel, architect
Peter has been working at cepezed since 2011. He takes a meticulous, solution-oriented and perfectionist approach to designing clear, tightly detailed buildings in which architecture and technology are integrated.
Peter has been working at cepezed since 2011. He takes a meticulous, solution-oriented and perfectionist approach to designing clear, tightly detailed buildings in which architecture and technology are integrated.
Peter graduated in Architecture from the Eindhoven University of Technology. With his graduation project he won the 2011 student STEEL award in the categories architecture & inventiveness.
The integral design methodology and eye for detail of cepezed fit well with his passion that he discovered during his studies: the intersection between architecture and engineering.
The Moreelse Bridge is a unique project at an equally unique location, in which assembly and prefabrication methods are crucial to making the project feasible. The bridge spans the tracks of Utrecht Central Station. Peter is especially proud of the successful integration of architecture, construction, trees and lighting.
The new accommodation of Lan Handling Technology is a fine example of a project designed by cepezed and cepezedinterieur and executed by cepezedbouwteam. Peter, from both cepezed and cepezedbouwteam, has been able to interfere with the detailing and construction up to the last screw. The result is a sturdy building, in which relatively simple materials have been used to create a sleek and beautiful building that fits well with Lan's corporate culture.